As an addendum - using critical path method, once you've identified a particular atomic critical path to it's lowest possible amount, that is likely your optimal run time.

eg: For wave defense with its small copper patches, copper becomes a critical path - even with speed modules in the miners. Even if you max out miners at the beginning, lowest possible theoretical time is likely around 20 to 30 minutes as RCU/LDS requires a lot of copper.