Overcrowd in 0m 54s 310ms by
Descrição
Used a 3 line strategy with two as transfer lines and the third as a connection line to ensure transfer for both triangle and square passengers.
Runs recentes
Used a 3 line strategy with two as transfer lines and the third as a connection line to ensure transfer for both triangle and square passengers.